自慰无码一区二区三区,欧美做爰一区二区三区,国产性色av高清在线观看 ,人妻夜夜爽天天爽三区丁香花

Cross


Order Hotline
18968916333
15397399668

Industry news 網(wǎng)站首頁Industry news

Things to be aware of when the cross-cutting machine is finished

發(fā)布日期:[2018-12-30]     點(diǎn)擊率:

The cross-cutting machine can be used for the cutting of paper materials such as coated paper, coated paper, kraft paper and paper-plastic composite, plastic sheet, etc., especially suitable for the production of paper industry and paper processing industry. Then, when using the cross-cutting machine, it is necessary to carry out regular maintenance, so as to ensure the smooth running of the machine and the cutting quality of the product.

First of all, the cross-cutting machine should be installed in a place that is dry, ventilated, with good light and convenient operation. Secondly, after each operation, it is necessary to clean the dust and paper scraps on the machine in time, check the cutter and the grinding wheel, check whether there is any abnormality in the running part, and reasonably add the lubricating oil. Side by side net oil moisture high and water storage tank. Finally, it is necessary to cut off the power of the cross-cutting machine according to the operation requirements of the manual and maintain the computer operating system.

crosscutting machine

The basic daily maintenance of the cross-cutting machine, the general principle is that the inspection, cleaning, and lubrication maintenance work is fully in place to ensure that the various components of the equipment are in good condition. In addition, it is also important to improve the technical quality and level of the operators. It is necessary to be responsible for the operation of the control part. No one is allowed to operate without permission.

Do a good job of maintenance and maintenance. First of all, daily maintenance should be in place. The principle is to lubricate, clean, clean (no dust, no debris) in place to ensure that the sliding part of the equipment is in good condition. Followed by maintenance work, regular and irregular inspections of the rotating parts (especially for real-time monitoring of consumables). Regular adjustments are made, regularly replaced, and detailed records are made to extend the life of the equipment. Regular cleaning and inspection of the electrical parts should be carried out in a timely manner to eliminate hidden dangers.

Use high quality slitters and cross cutters. Improve the technical quality and level of the operator, and be responsible for the operation of the control part. No one can operate it without permission.

Tr

亚洲国产综合另类视频| 日韩精品人妻无码久久影院| 国产成人a视频高清在线观看| 少妇人妻偷人精品无码视频| 无码伊人久久大杳蕉中文无码| 国产台湾无码av片在线观看| 成年轻人网站色直接看| 国产精品少妇酒店高潮| 在线观看国产一区二区三区| 中文无码伦av中文字幕| 好吊妞无缓冲视频观看| 国产精品青草久久久久福利99| 女人18毛片水最多| 欧美 日韩 亚洲 精品二区| 人妻av无码系列专区移动可看| 精品久久久久中文字幕一区| 国产欧美日韩亚洲一区二区三区| 影音先锋男人站| 无码成人免费全部观看| 亚洲日本中文字幕在线四区| 婷婷五月六月激情综合色中文字幕| 久久久久久亚洲精品无码| 成人国产一区二区三区| 青青青国产免费线在| 成人麻豆精品激情视频在线观看 | 全部孕妇毛片| 久久国产福利国产秒拍飘飘网| 成人一在线视频日韩国产| 久久精品毛片免费观看| 色欲久久久中文字幕综合网 | 性视频播放免费视频| 免费看小12萝裸体视频国产| 欧美最爽乱婬视频免费看| 亚洲精品尤物av在线观看不卡| 一本一道av无码中文字幕﹣百度| 中文字幕久无码免费久久| 亚洲粉嫩美白在线| 免费国产在线精品一区不卡| 久久国产精品波多野结衣av| 国产精品黄在线观看免费软件| 无码一区二区三区av免费|